250430-A-CE000-1003
A contractor works on the roof of Vicenza Elementary School as part of ongoing roof repair work next to newly-designed guardrails on U.S. Army Garrison Italy in Vicenza April 30, 2025. This passive fall-protection system provides workers with more effective fall protection while allowing them better freedom of movement. (U.S. Army photo by Brad Lein)

Download Image: Full Size (3.28 MB)
Photo by: Brad Lein |  VIRIN: 250430-A-CE000-1003.JPG