In Situ Soil Stabilization Process
Marshy soil is being mixed with concrete and water to create a strong foundation for a levee as part of the Port Monmouth Flood Risk Management Project in Port Monmouth, New Jersey.

Download Image: Full Size (0.29 MB)
Tags:
Photo by: JoAnne Castagna |  VIRIN: 170727-D-CR197-002.JPG