Leadership

    official photograph of Joseph Forcina, Chief, Hurricane Sandy Coastal Management Division

Joseph Forcina
Chief, Civil Works Integration Division

Contact Us

E-mail: dll-cenado-pa@usace.army.mil

Phone: 347-370-4548

Points of Contact

 

Headquarters USACE 202-761-1808

North Atlantic Division
347-370-4548

New England District
978-318-8657

New York District
917-790-8007

Philadelphia District
215-656-6515

Baltimore District
410-962-2809

Norfolk District
757-201-7673

 

All Hurricane Sandy recovery projects by state

Collapse All Expand All
 Connecticut

• Prospect Beach, West Haven beach restoration
• Woodmont Beach, Milford beach restoration
• Bridgeport Harbor breakwater repairs
• New Haven Harbor breakwater repairs and dredging
• Stamford Hurricane Barrier cable repairs
• Clinton Harbor dredging
• Little Narragansett Bay dredging
• Guilford Harbor dredging
• Morris Cove, New Haven erosion and coastal storm risk management

 Delaware

• Roosevelt Inlet to Lewes beach restoration
• Rehoboth to Dewey beach restoration
• Fenwick Island beach restoration
• Delaware Coast Protection beach restoration
• Bethany/South Bethany beach restoration
• Delaware River, Philadelphia to Sea dredging
• Indian River Inlet and Bay dredging
• Intracoastal Waterway, Delaware to Chesapeake Bay dredging
• Wilmington Harbor dredging
• Project Condition Surveys dredging
• Broadkill Beach coastal storm risk management project
• Pennsylvania Ave. Improvement, Bethany dredged material utilization study
• Delaware River Dredged Material Utilization flood risk management project

 Maine

• Wells Harbor dredging
• Scarborough River dredging
• Kennebunk River dredging

 Maryland

• Atlantic Coast of Maryland (Rehab) shoreline and dunes
• Dredge Baltimore Harbor to 50 feet
• Ocean City Harbor & Inlet dredging
• Wicomico River dredging
• Jane’s Island, Somerset County beach erosion and storm risk management

 Massachusetts

• Green Harbor jetty repair
• New Bedford Fairhaven and Acushnet Hurricane Barrier unwater and repair
• Newburyport Harbor breakwater repair
• Hyannis Harbor dredging
• Buttermilk Bay Channel dredging
• Falmouth Harbor dredging
• Cuttyhunk Harbor dredging
• Nantucket Harbor of Refuge breakwater repairs
• Menemsha Creek jetty repair
• Rockport Harbor jetty repair
• Cohasset Harbor dredging
• Coastal Areas, Marshfield erosion and storm risk management
• Nantasket Beach, Hull erosion and storm risk management

 New Jersey

• Raritan Bay and Sandy Hook Bay, (Keansburg) beachfill
• Sandy Hook to Barnegat Inlet (Sea Bright to Manasquan) beachfill
• Barnegat Inlet to Little Egg Harbor Inlet beachfill
• Brigantine Island beachfill
• Absecon Island beachfill
• Great Egg Harbor/Peck Beach beachfill
• Townsend Inlet to Cape May beachfill
• Cape May to Lower Township beachfill
• Cheesequake Creek dredging
• New York and New Jersey Channels dredging
• New York Harbor dredging
• Newark Bay dredging
• Raritan River to Arthur Kill dredging
• Raritan River dredging
• Sandy Hook Bay at Leonardo dredging
• Shark River dredging
• Shoal Harbor And Compton Creek dredging
• Shrewsbury River, Main Channel dredging
• Keyport Harbor dredging
• Project Condition Surveys
• Barnegat Inlet dredging
• Cold Spring Inlet dredging
• Manasquan River dredging
• New Jersey Intracoastal Waterway dredging
• Salem River dredging
• Absecon Inlet dredging
• Project Condition Surveys
• Toms River dredging
• Minish Park flood risk management
• Passaic River Mainstem tidal and non-tidal re-evaluation
• Port Monmouth flood risk management
• Union Beach flood risk management
• Sandy Hook to Barnegat Inlet flood risk management
• South River, Raritan flood risk management
• Barnegat Inlet to Little Egg Harbor Inlet flood risk management
• Abescon Island flood risk management
• Oakwood Beach flood risk management
• Great Egg Harbor Inlet to Townsends Inlet
• Manasquan Inlet to Barnegat Inlet
• Rahway River Basin study
• Highlands Storm Damage study
• Leonardo study
• Shrewsbury River study
• Wreck Pond study
• Alternative Long Term Nourishment study
• Delaware River Comprehensive study
• Hereford Inlet / Cape May Inlet study
• Delaware River Dredged Material study
• Seaside Park beach erosion and storm risk management

 New York

• Fire Island Inlet to Montauk Point, West of Shinnecock Inlet (WOSI) beachfill
• Fire Island Inlet to Montauk Point (Westhampton) beachfill
• Fire Island Inlet and Shores West to Jones Inlet (Gilgo Beach) beachfill
• East Rockaway Inlet to Rockaway Inlet and Jamaica Bay beachfill
• Atlantic Coast of New York City, Rockaway Inlet (Coney Island) beachfill
• Oakwood Beach levee repair
• Bay Ridge and Red Hook Channel dredging
• Browns Creek dredging
• East Rockaway Inlet dredging
• Fire Island Inlet to Jones Inlet dredging
• Great Kills Harbor dredging
• Great South Bay dredging
• Hudson River Channel dredging
• Hudson River maintenance dredging
• Jamaica Bay dredging
• Jones Inlet dredging
• Lake Montauk Harbor dredging
• Long Island Intracoastal Waterway dredging
• Mattituck Harbor dredging
• Moriches Inlet dredging
• New York Harbor, drift removal
• Sag Harbor breakwater rehabilitation
• Project Condition Survey
• Coney Island (Sea Gate) and erosion control
• Fire Island Inlet to Montauk Point (FIMP) - Westhampton Interim erosion control and storm risk management
• Long Beach re-analysis of groin fields
• Montauk Point reformulation study
• Rockaway Beach storm risk management and nourishment
• Hashamomuck Cove streambank stabilization, navigation, flood risk management
• Jamaica Bay environmental restoration
• Lake Montauk feasibility study
• Bayville erosion and flood risk management
• Asharoken erosion and flood risk management
• Staten Island coastal storm risk management
• Island Park Beach erosion and storm risk management

 Rhode Island

• Misquamicut Beach, Westerly erosion control and beach berm
• Block Island Harbor of Refuge east backwater repair, wharf repair
• Point Judith Harbor of Refuge jetty, camp cronin, east shore arm repairs
• Sakonnet Harbor breakwater repairs
• Pawcatuck River and Rhode Island coastal investigation
• Pawcatuck River flood study

 Virginia

• Virginia Beach storm damage risk management
• Sandbridge Beach beachfill
• Little Wicomico River dredging
• Cape Charles City dredging
• Chincoteague Inlet dredging
• Norfolk Harbor Channel dredging
• Project Condition Surveys
• Rudee Inlet dredging
• Tangier Channel dredging
• Waterway Coast Of Virginia dredging
• Norfolk Harbor Craney Island revetment
• Tylers Beach dredging
• Bennett Creek dredging
• Onancock River dredging
• Starlings Harbor dredging
• Blackwater River dredging
• James River dredging
• Lynnhaven Inlet dredging
• Willoughby Spit, Norfolk berm and beachfill
• Pretty Lake flood risk management
• Hague flood risk management